Staveley Road School Street
Part of email received from LBOH todayWith regards to the Staveley Road school street for Chiswick School, this will also not provide residential access. However, this is only in operation for two hours a day from Monday – Friday, at all other times residents are free to drive along this section of Staveley Road. Burlington Lane remains open to traffic at all times. More on this school street scheme can be found here: https://www.hounslow.gov.uk/info/20053/transport/2181/south_chiswick_liveable_neighbourhood/8 Please note that these are trial schemes and therefore we are keen on receiving your feedback on these measures throughout the trial period, which will be reviewed before determining if they should continue beyond this time, or be changed or removed – therefore, should you wish to share any feedback/suggestion(s) that you believe could improve the scheme, please feel free to share them with us via the Streetspace Feedback page. More information on the background to the projects can be found here, along with a list of FAQs; https://tinyurl.com/southchiswick Chiswick School StreetThis School Street scheme will introduce A “No Motor Vehicle” access restriction on a section of Staveley Road between the A316 and Burlington Lane. Road users will be made aware of these restrictions by the placement of a “no motor vehicles” sign with the times these are in operation (8:00 – 9:00am and 2:45 – 3:45pm Monday to Friday). These restrictions will not apply to buses, delivery vehicles or school staff. Residential exemptions will not be issued as residential properties are not located within the scheme area. This closure of the road at school start and end times further supports the additional closure measures on Staveley Road, to remove a high proportion of through traffic that uses the road to connect between the A316 and A4. Access will be retained to the street for those residents and students who are walking or cycling. A copy of a letter explaining the scheme in more detail can be viewed below, alongside a copy of the plan showing the extents of the scheme.Planhttps://www.hounslow.gov.uk/downloads/file/2817/chiswick_school • Expected implementation date: November 2020 • Interim review: Feb/March 2021 • First formal review: May/June 2021
Bernard Allen ● 2170d41 Comments ● 2158d