Road Closures Ahead in Putney and Roehampton


Diversions and delays in the local area due to road works

putney road closures

Major Gasworks In Wandsworth One-Way System (6 weeks)

A205 Upper Richmond Road, Putney

22 September — 21 October

Delays possible Some carriageway incursion

Works description: Skip: c/w incursion, but skip located in a bay that has already been suspended by the same applicant.; working hours: 0700-1900 (the hours in which the bay is in operation)24h contact: Rick Smith/Nicole Allan 01515202772

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG450393630

Montserrat Road, Putney

04 October — 11 October

Delays unlikely Traffic control (give & take)

Works description: To disconnect gas and fit a new dual service to 89-93 putney high street, excavating down the side of 91 Puyney High Street on Montserrat Road in the near side carriageway maintaining normal traffic flow, excavating down the side of 91 Putney High Street on Montserrat Road in the near side footway within the site footway closure, once reinstated to excavate in the near side carriageway to be maintained using give and take

Responsibility for works: SGN

Current status: Planned work about to start

Works reference: XW047W115613622-03409/1

A306 Roehampton Lane, Roehampton

05 October — 07 October

Delays likely Lane closure

Works description: Maintenance - BROKEN 1X GRANITE KERB. Lane 2

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG443394948

A306 Roehampton Lane, Roehampton

05 October — 07 October

Delays likely Lane closure

Works description: CPP - Maintenance - LOOSE 1X GRANITE KERB. Lane 1

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG443394950

A306 Roehampton Lane, Roehampton

05 October — 07 October

Delays likely Lane closure

Works description: Maintenance - BROKEN 1X GRANITE KERB. Lane 2

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG443394948

A3209 Putney Bridge Road

05 October — 07 October

Delays likely Lane closure

Works description: Maintenance - RESET DISLODGED KERBSTONE-PR Lane 1

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG443394918

A3 West Hill, Wandsworth

05 October — 06 October

Delays likely Lane closure

Works description: Maintenance - SUNKEN GULLY C + FRAME + ROCKING. Lane 1

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG443394806

Priory Lane, Roehampton

01 October — 23 November

Delays possible Traffic control (multi-way signals)

Works description: IMGA171041. ABANDON 217M X 100/300mm DI MAIN AND INSERT 90/180MM PEANDRELAY OR TRANSFER SERVICES.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000733111

Holroyd Road, Putney

02 October — 05 October

Delays unlikely Some carriageway incursion

Works description: WATER METER INSTALLATION IN FOOTWAY

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU039NOT-200629

Heathview Gardens, Putney

02 October — 09 October

Delays possible Traffic control (two-way signals)

Works description: Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-600mm):INSTALL 100AMP THREE PHASE SUPPLY. ROAD CROSSING HALF& HALF UNDER 2 WAY LIGHTS - TM AGREED WITH SCOTT RICHARDSON

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC40010753374

Montserrat Road, Putney

04 October — 11 October

Delays unlikely Traffic control (give & take)

Works location: Unknown

Works description: To disconnect gas and fit a new dual service to 89-93 putney high street, excavating down the side of 91 Puyney High Street on Montserrat Road in the near side carriageway maintaining normal traffic flow, excavating down the side of 91 Putney High Street on Montserrat Road in the near side footway within the site footway closure, once reinstated to excavate in the near side carriageway to be maintained using give and take

Responsibility for works: SGN

Current status: Planned work about to start

Works reference: XW047W115613622-03409/1

Priory Lane, Roehampton

01 October — 23 November

Delays possible Traffic control (multi-way signals)

Works description: IMGA171041. ABANDON 217M X 100/300mm DI MAIN AND INSERT 90/180MM PEANDRELAY OR TRANSFER SERVICES.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000733111


Dover House Road SW15 will be closed at the junction with Upper Richmond Road for TFL carriageway and footway works commencing 08/10/2018 to 21/10/2018 (night works only). Contact: TFL 0343 222 1234.

Upper Richmond Road SW15 two-way temporary traffic signals at the junction with Dover House Road for TFL carriageway and footway works commencing 08/10/2018 to 21/10/2018. Contact: TFL 0343 222 1234.


Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.

October 5, 2018