Road Closures Ahead in Putney and Roehampton


Diversions and delays in the local area due to road works

Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.

B349,B306 Lower Richmond Road, Putney

07 August — 09 August

Delays likely Traffic control (two-way signals)

Works location: Unknown

Works description: Service Pipe Repair<33mm Cway & fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU302000031075554-002

Norroy Road, Putney,

05 August — 09 August

Delays likely Road closure

Works location: Unknown

Works description: Remedial works to rectify core defect recieved. Relating to sewer repair works in carriageway

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002250ZQNR--000003

A219 Putney Bridge, Putney

05 August — 05 August

Delays possible Lane closure

Works location: Unknown

Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU600PUT005-9

Inner Park Road, Southfields

05 August — 21 December

Delays possible Traffic control (multi-way signals)

Works location: Unknown

Works description: Excavate and conduct camera survey on existing 12" main to determine services& connections ahead of gas main insertion. Insert approx. 606m of new 250mm PE, make multiple major connections onto existing gas mains. Transfer/relay every service along this road onto new 250mm PE, backfill & reinstate

Responsibility for works: SGN

Current status: Planned work about to start

Works reference: XW053W116415367-02523

A205 Upper Richmond Road, Putney

20 July — 02 November

Delays likely Traffic control (multi-way signals)

Works description: Lay 24mtrs 355mm and 217mtrs 250mm PE. Abandon 241mtrs of 15" and 15mtrs 4" CI. Complete all services. Make 7 mains connections. Complete all reinstatement.

Responsibility for works: SGN

Current status: Advanced planning

Works reference: XW053W116185355-05667

Priory Lane,

03 August — 05 August

Delays likely Road ahead closed

Name: Priory Lane

Location: Priory Lane

Description: Public event - Cycling

Responsibility for event: RideLondon

Current status: Planned

Richmond Park,

03 August — 05 August

Delays likely Road closure

Name: Priory Lane

Location: Richmond Park

Description: Public event - Cycling

Responsibility for event: RideLondon

Current status: Planned

Putney High Street SW15 lane closure outside St Mary’s Church for Thames Water utility works on 05/08/2019 and also 09/08/2019, NIGHT WORKS. Contact: Thames Water 0800 009 3961.
Augustus Road, Southfields
15 July — 25 August
Delays likely Road closure
Works description: Excavate and expose cap end of new 250mm PE, abandon section of 12" CI. Complete all services& reinstate.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W116415411-00187

Augustus Road, Southfields

01 May — 06 October

Delays likely Road closure

Works description: Excavate and insert approx 500m of 250mm PE. Transfer all services and make connections onto existing gas mains. Abandon approx 500m of 12" gas main. Works to be completed in 3 phases.

Responsibility for works: SGN

Current status: Planned work about to start

Works reference: XW053W116070246-00187


Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

August 5, 2019