Road Closures Ahead in Putney and Roehampton
Diversions and delays in the local area due to road works
Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.
Prudential Ride London 2019
The roads listed below are closed on Sunday 4th August for Prudential Ride London:
Wimbledon Park Side SW19
Tibbet’s Corner SW19
Tibbet’s Ride SW15
Putney Hill SW15
Putney High Street SW15
Putney Bridge SW15
Chelsea Bridge, Albert Bridge, Battersea Bridge will all be closed and Wandsworth Bridge will be closed with access for residents only from 07:00 hours to after 19:30 hours
Major disruption is expected in the Putney and Wandsworth areas of the Borough. For further information please visit www.prudentialridelondon.co.uk or see the local leaflet.
|
A306 Roehampton Lane, Roehampton |
29 July — 31 July |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: Unknown |
|
|
Works description: TM Signage Only (No Excavation) |
|
|
Responsibility for works: VIRGIN MEDIA |
|
|
Current status: Planned work about to start |
|
|
Works reference: NK100/SSEMBU/100292470 |
|
|
|
|
|
|
A219 Putney Bridge, Putney |
31 July — 01 August |
|
|
Delays possible Lane closure |
|
Works location: Unknown |
|
|
Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY. |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU600PUT006-9 |
|
|
|
|
A3209 Putney Bridge Road |
31 July — 02 August |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Install 23m of 1 way poly duct in Footway,Locate and excavate 3 blockage in existing duct |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500283259600 |
|
|
|
|
A3209 Putney Bridge Road |
31 July — 02 August |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Perform 1 reinstatement activity,Performing an 1excavation to expose existing power cable in Footway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500262846403 |
|
|
|
|
B306 Queens Ride, Barnes |
31 July — 02 August |
|
|
Delays possible Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Reprofile carriageway to allow free flow of water in channel. Ch8 reqd RWHrs reqd, T.M reqd |
|
|
Responsibility for works: Richmond upon Thames |
|
|
Current status: Planned work about to start |
|
|
Works reference: KP601WKS2190569 |
|
|
|
|
Priory Lane, Roehampton |
30 July — 04 August |
|
|
Delays possible Traffic control (two-way signals) |
|
Works location: Unknown |
|
|
Works description: Works in footway and carriageway to carry out Service pipe relay between the existing Water main and BEES KNEES NURSERY SCHOOL boundary, as part of Thames Water's Lead Pipe Replacement Project. |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU276IA/AMP6/SCH/WAN/003 |
|
|
|
|
|
A205 Upper Richmond Road, Putney |
20 July — 02 November |
Delays likely Traffic control (multi-way signals) |
Works description: Lay 24mtrs 355mm and 217mtrs 250mm PE. Abandon 241mtrs of 15" and 15mtrs 4" CI. Complete all services. Make 7 mains connections. Complete all reinstatement. |
Responsibility for works: SGN |
Current status: Advanced planning |
Works reference: XW053W116185355-05667 |
|
|
Augustus Road, Southfields |
15 July — 25 August |
Delays likely Road closure |
Works description: Excavate and expose cap end of new 250mm PE, abandon section of 12" CI. Complete all services& reinstate. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116415411-00187 |
|
|
|
Augustus Road, Southfields |
01 May — 06 October |
Delays likely Road closure |
Works description: Excavate and insert approx 500m of 250mm PE. Transfer all services and make connections onto existing gas mains. Abandon approx 500m of 12" gas main. Works to be completed in 3 phases. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116070246-00187 |
Street Party – 04/08/2019
Bangalore Street SW15 closed from outside number 37 to outside number 57
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
July 30, 2019
|