Road Closures Ahead in Putney and Roehampton
Diversions and delays in the local area due to road works
Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.
A219 Putney High Street, Putney |
27 May — 28 May |
Delays likely Lane closure |
Works description: SAHARA SURVEYING FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU600OP016A-11 |
|
A219 Putney Hill, Putney |
28 May — 30 May |
Delays likely Traffic control (multi-way signals) |
Works description: Valve Repack 0 to 6" Fway in Footway. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031256814-001 |
|
B349,B306 Lower Richmond Road, Putney |
28 May — 30 May |
Delays likely Traffic control (two-way signals) |
Works description: Serv Pipe Relay Ex Fitting Sz P Fway& Cway in Carriageway. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031103614-001 |
A3209 Putney Bridge Road, |
30 May — 03 June |
Delays possible Some carriageway incursion |
Works description: Perform 1 reinstatement activity,Performing an 1excavation to expose existing power cable in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500262846403 |
|
A3209 Putney Bridge Road, |
30 May — 03 June |
Delays possible Some carriageway incursion |
Works description: Perform 1 reinstatement activity,Performing an 1excavation to expose existing power cable in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500262846402 |
|
|
Augustus Road, Southfields |
24 May — 21 June |
Delays likely Road closure |
Works description: Excavte and expose existing 12" CI, conduct camera survey to locate connections. Prepare existing gas mains for insertion, insert approx. 200m of new 250mm PE. Excavate & expose valves & pressure points. Undertake up to 4x major connections, transfer any services identified by camera survey, backfill & reinstate. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116194117-00187 |
|
Galveston Road, Putney |
17 May — 04 June |
Delays likely Road closure |
Works description: Excavate in carriageway to repair sewer relating to internal flooding |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026003345JSCC001003 |
|
Augustus Road, Southfields |
01 May — 06 October |
Delays likely Road closure |
Works description: Excavate and insert approx 500m of 250mm PE. Transfer all services and make connections onto existing gas mains. Abandon approx 500m of 12" gas main. Works to be completed in 3 phases. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116070246-00187 |
Urmston Drive, Southfields |
29 April — 10 June |
Delays likely Road closure |
Works description: 1x major connection from new 250mm main onto existing 125mm PE in conjunction with gas main replacement works on Augustus Road. Closure to remain for storage& welfare as works progress up Augustus Road. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W116185880-05765 |
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
May 28, 2019 -->
|