Road Closures Ahead in Putney and Roehampton
Diversions and delays in the local area due to road works
Priory Lane, Roehampton |
15 February — 12 April |
Delays possible Traffic control (multi-way signals) |
Works description: IMGA171041. ABANDON 217M X 100/300mm DI MAIN AND INSERT 90/180MM PEANDRELAY OR TRANSFER SERVICES. |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000763117 |
B349,B306 Lower Richmond Road, Putney |
03 March — 08 March |
Delays likely Traffic control (two-way signals) |
Works description: SEW BLCK TRAFFIC SENSITIVE ST |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002251ZXCM--000008 |
|
B349,B306 Lower Richmond Road, Putney |
03 March — 08 March |
Delays likely Traffic control (two-way signals) |
Works description: SEW BLCK TRAFFIC SENSITIVE ST |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002251ZXCM--000005 |
|
A205 Upper Richmond Road, Putney |
04 March — 10 March |
Delays likely Traffic control (two-way signals) |
Works description: 10/170 - 111185 - Upgrade to TfL Pedestrian crossing. F/W works. Main signals switched out and Temp signals deployed for duration of works. Remove old signal poles. Installation of new NAL socket and connection of existing ducting Excavation to remove old traffic signal controller. Install of new NAL controller base and connection of existing ducts. 19:00 - 23:59 W/B lane 1 closure under Temp signals to allow for ped walkway to install NAL socket pole 2.04/03/19 for 2 nights 20:00-01:00 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG515S000000002265 |
|
B349,B306 Lower Richmond Road, Putney |
03 March — 08 March |
Delays likely Traffic control (two-way signals) |
Works description: SEW BLCK TRAFFIC SENSITIVE ST |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002251ZXCM--000005 |
|
B349,B306 Lower Richmond Road, Putney |
03 March — 08 March |
Delays likely Traffic control (two-way signals) |
Works description: SEW BLCK TRAFFIC SENSITIVE ST |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002251ZXCM--000008 |
|
Roedean Crescent, Roehampton |
04 March — 22 March |
Delays possible Traffic control (two-way signals) |
Works description: Sewer Connections |
Responsibility for works: Wandsworth |
Current status: Planned work about to start |
Works reference: PB020S000000000514 |
|
A205 Upper Richmond Road, Barnes |
04 March — 10 March |
Delays unlikely No carriageway incursion |
Works description: 10/168 - 111248 - Upgrade to TfL Pedestrian crossing. Permanent signals switched out and pedestrian dependant temporary signals deployed for duration of works, they will be in the footway in front of the existing signals. Excavation to remove old traffic signal controller. Installation of new NAL controller base and connection of existing ducts. 19:00 - 23:59. Footway works |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG515S000000002266 |
|
A205 Upper Richmond Road, Putney |
04 March — 10 March |
Delays unlikely No carriageway incursion |
Works description: 10/168 - 111248 - Upgrade to TfL Pedestrian crossing. Permanent signals switched out and pedestrian dependant temporary signals deployed for duration of works, they will be in the footway in front of the existing signals. Excavation to remove old traffic signal controller. Installation of new NAL controller base and connection of existing ducts. 19:00 - 23:59. Footway works |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG515S000000002267 |
|
A219 Putney Bridge, Putney |
04 March — 17 March |
Delays unlikely No carriageway incursion |
Works description: Footway work - lifting the existing footway slabs and relaying them on sand and cement |
Responsibility for works: Wandsworth |
Current status: Planned work about to start |
Works reference: PB002PN0007119/MZ |
|
Keswick Road, Putney |
04 March — 06 March |
Delays unlikely Some carriageway incursion |
Works description: To excavate and connect onto the existing gas main, to excavate approx. 3m and lay a new gas main into site |
Responsibility for works: E S Pipelines Ltd |
Current status: Planned work about to start |
Works reference: ZY0401707100-1 |
|
St Johns Avenue, Putney |
04 March — 15 March |
Delays unlikely Some carriageway incursion |
Works description: Install 104m of 1 way poly duct in Footway,Install 9m of 1 way poly duct in Carriageway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500271679901 |
|
A219 Putney High Street, Putney |
07 March — 08 March |
Delays likely Traffic control (two-way signals) |
Works description: Rectifiy Dangerous rein defect - non-pay in Carriageway. Our intentionis to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000030969791-003 |
B349,B306 Lower Richmond Road, Putney |
08 March — 10 March |
Delays likely Traffic control (multi-way signals) |
Works description: Lay new services to 221 - excavating in the n/s f/w whilst maintaining a minimum width of 1.2m for pedestrians, excavating in the nearside carriageway which will be maintained using 3 way lights (third light on Commondell) Friday 08/03 - excavation works - Sat 09/03 - lay concrete - 10/03 complete reinnstatement - Bus stops outside 217 and opposite 227 to be suspended following site meeting comments |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW047W115830932-03046 |
Water Leaks and Gas Escapes Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.
March 8, 2019
|