Road Closures Ahead in Putney and Roehampton


Diversions and delays in the local area due to road works

putney road closures

A219 Putney High Street, Putney

22 February — 22 February

Delays likely Lane closure

Works description: Excavate in the carriageway to rectify failed reinstatement

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SCLDMA/NLO09706

A219 Putney High Street, Putney

23 February — 24 February

Delays likely Traffic control (two-way signals)

Works description: Disconnection of 4" CI main excavating 4m footway and 1m in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU309000806567540040-003

Dover House Road, Putney

22 February — 22 February

Delays possible Traffic control (Stop/Go boards)

Works description: W.R.P. - Re-site of 2 Bay Non Ad Bus Shelter, Back to Kerb, for and on behalf of Transport For London 0132/9297

Responsibility for works: LONDON TRANSPORT

Current status: Planned work about to start

Works reference: RK00100041796

Priory Lane, Roehampton

15 February — 12 April

Delays possible Traffic control (multi-way signals)

Works description: IMGA171041. ABANDON 217M X 100/300mm DI MAIN AND INSERT 90/180MM PEANDRELAY OR TRANSFER SERVICES.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000763117

A219 Putney Hill, Putney

20 February — 22 February

Delays possible Some carriageway incursion

Works description: Water meter pit installation in footway& carriageway

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU039MGJV/BULK/211011

A306 Roehampton Lane, Roehampton

19 February — 22 February

Delays possible Some carriageway incursion

Works description: THESE WORKS ARE FOR THE EXCAVATION AND INSTALLATION OF MONO-POLE & CABINET BASES TO INCLUDE ASSOCIATED DUCTING.

Responsibility for works: O2 (UK) Limited

Current status: Planned work about to start

Works reference: MG07237094-ICS-WK08

Clarence Lane, Roehampton

18 February — 26 February

Delays possible Traffic control (two-way signals)

Works description: IMGC190007 - Lay a 90mm Service to Kiosk on property, connection toexisting 250mm main in footway opposite.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000772304

Priory Lane, Roehampton

20 February — 22 February

Delays possible Traffic control (two-way signals)

Works description: Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 2m of 1 way poly duct in Footway

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500272970001

Lower Richmond Road SW15 two-way temporary traffic signals outside number 168 for Thames Water utility commencing 24/02/2019 to 01/03/2019 (night works only). Contact: Thames Water 0800 009 3961.

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.

February 22, 2019