Road Closures Ahead in Putney and Roehampton
Diversions and delays in the local area due to road works
Embankment, Putney |
04 January — 14 January |
Delays unlikely Some carriageway incursion |
Works description: 1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway,Install 31m of 1 way poly duct in Carriageway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500273407200 |
|
Augustus Road, Southfields |
08 January — 18 February |
Delays likely Road closure |
Works description: Excavate to replace approx. 200m of existing high risk 16" CI main with new 355mm PE gas main, make connections& reinstate. |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W115747594-00187 |
A219 Putney Hill, Putney |
09 January — 11 January |
Delays possible Some carriageway incursion |
Works description: Water meter pit installation in footway& carriageway |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU039MGJV/BULK/208020 |
Oakhill Road, Putney |
09 January — 15 January |
Delays possible Traffic control (two-way signals) |
Works description: New water connection 1x25mm B/P MTRD supply off of 5" CI main excavating2m footway and 6m in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU309000807655610045-002 |
A205 Upper Richmond Road, Putney |
10 January — 11 January |
Delays possible Some carriageway incursion |
Works description: Maintenance - Install Bollard Part lane 1 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG443401489 |
A3 West Hill |
11 January — 12 January |
Delays likely Traffic control (two-way signals) |
Works description: 10/092 TEL0209418 - Access TfL traffic signal pole 1, complete a bulk lamp change, to check backing boards and other relevant assets. 23:00-05:00. E/B lane 1. Short stay works, approx 15 mins on site. No noisy works involved |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG516S000000004418 |
A219 Putney High Street, Putney |
12 January — 13 January |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: New water connection 1x25mm MDPE MTRD supply off of 4" CI mainexcavat ing 4m footway and 1m in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU309000806567540040-001 |
Lower Richmond Road SW15 multi-way temporary traffic signals opposite number 217 to junction of Commondale and the junction of Sefton Street for BT utility works commencing 12/01/2019 to 13/01/2019. Contact: BT 01257 325 300.
|
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.
January 10, 2019
|