Road Closures Ahead in Putney and Roehampton
Diversions and delays in the local area due to road works
|
|
Bramcote Road, Putney |
17 December — 20 December |
|
|
Delays possible Traffic control (two-way signals) |
|
Works location: Unknown |
|
|
Works description: New water connecton 1x32mm MDPE MTRD supply off of 4" CI main excavating3m footway and 3m in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU309000807687740045-001 |
|
|
A3 Kingston Road, Roehampton |
19 December — 19 December |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: 10/522 TEL0207063 - RECUT OF MAGNETOMETER SD1 (522), 22:00 - 23:59, SW/B LANE 1 & 2 CLOSURE, MOVING ALL TRAFFIC INTO LANE 3. |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG516S000000004356 |
|
|
|
|
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.
December 19, 2018
|