Road Closures Ahead in Putney and Roehampton


Diversions and delays in the local area due to road works

putney road closures

Pirbright Road, Southfields

26 November — 08 December

Delays likely Road closure

Works location: Unknown

Works description: Carriageway work - copenhagen style' Entry treatment

Responsibility for works: Wandsworth

Current status: Advanced planning

Works reference: PB002PN0001242018/RM

A219 Putney High Street, Putney

28 November — 28 November

Delays likely Lane closure

Works description: 10/029 tel0182363 - slot cut c/w sensor loops to repair traffic signals SD1 plus feed to existing chamber (f/w 2m new duct and underkerb) 21.00-23.00, northbound c/w swapping lane 1& 2 and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004296

A3209 Putney Bridge Road

28 November — 28 November

Delays likely Lane closure

Works description: 10/029 tel0182363 - TM ONLY for - slot cut c/w sensor loops to repair traffic signals SD1, 21.00-23.00, westbound lane 2

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004297


Roehampton Lane SW15 multi-way temporary traffic signals opposite number 166 for emergency Thames Water utility works. Estimated completion date is 26/11/2018. Contact: Thames Water 0800 009 3961.

Putney High Street SW15
lane closure outside number 167 to outside number 175 for BT Openreach utility works on 27/11/2018 (night works only). Contact: BT Openreach 03301 233 753.


Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information contact the Engineer in the first instance or e-mail streetworks@wandsworth.gov.uk.

November 28, 2018