Road Closures Ahead in Putney and Roehampton
Diversions and delays in the local area due to road works
Lower Richmond Road SW15 two-way temporary traffic signals outside number 205 for emergency Thames Water utility works. Estimated completion date is 04/06/2018. Contact: Thames Water 0800 009 3961.
Clarence Lane, Roehampton |
28 May — 15 July |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: WORKING ON BEHALF OF THAMES WATER: SURFACE LOCATION: FW/CW |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU823H553/MHA632/Z004 |
|
Cardinal Place, Putney |
29 May — 01 June |
Delays unlikely No carriageway incursion |
Works description: METER INSTALLATION IN FOOTWAY |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU039NOT-191041-01 |
|
Clarence Lane, Roehampton |
28 May — 15 July |
Delays unlikely Some carriageway incursion |
Works description: WORKING ON BEHALF OF THAMES WATER: SURFACE LOCATION: FW/CW |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU823H553/MHA632/Z004 |
|
Deodar Road, Putney, |
29 May — 02 June |
Delays unlikely No carriageway incursion |
Works description: Connections Highway Services:Disconnection / reconnection of existing electricity supply for a customer:DISCONNECTION OF ELECTRICAL SUPPLY TO A P&D |
Responsibility for works: Wandsworth |
Current status: Planned work about to start |
Works reference: PB60050024236 |
A205 Upper Richmond Road, Putney |
30 May — 01 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: BT/Armada need to install a fish plate for the new phone box. Pedestrian management will be installed. |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC005PL1W0000LOWW0046/01 |
|
|
|
|
A219 Putney High Street, Putney |
31 May — 02 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Replace 1 jointbox frame and cover(s) (725mm x 225mm) in Footway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500261659306 |
|
|
|
|
Earldom Road, Putney |
30 May — 01 June |
Delays unlikely No carriageway incursion |
Works description: Replace 1 jointbox frame and cover(s) (915mm x 445mm) in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500263162200 |
|
Fawe Park Road, Putney |
30 May — 02 June |
Delays unlikely No carriageway incursion |
Works description: Service Pipe Reconnect Footway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031075593-001 |
|
Holroyd Road, Putney |
30 May — 02 June |
Delays unlikely No carriageway incursion |
Works description: Service Pipe Repair |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031078821-001 |
|
Oakhill Road, Wandsworth |
30 May — 02 June |
Delays unlikely Some carriageway incursion |
Works description: WATER METER INSTALLATION IN FOOTWAY |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU039NOT-191061-01 |
|
Oakhill Road, Wandsworth |
30 May — 02 June |
Delays unlikely Traffic control (priority working) |
Works description: Main Clamp 0 to 6" Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031080682-001 |
|
Priory Lane, Roehampton |
30 May — 02 June |
Delays unlikely No carriageway incursion |
Works description: Install 2m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500262952301 |
|
Stratford Grove, Putney |
30 May — 01 June |
Delays unlikely Some carriageway incursion |
Works description: Rectifiy reinstatement defect in footway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU302000031054911-001 |
|
|
Tangley Grove, Roehampton |
29 May — 31 May |
Delays unlikely No carriageway incursion |
Works description: Replace 1 jointbox frame and cover(s) (915mm x 445mm) in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500263165700 |
|
|
Deodar Road, Putney |
29 May — 02 June |
Delays unlikely No carriageway incursion |
Works description: Connections Highway Services:Disconnection / reconnection of existing electricity supply for a customer:DISCONNECTION OF ELECTRICAL SUPPLY TO A P&D |
Responsibility for works: Wandsworth |
Current status: Planned work about to start |
Works reference: PB60050024236 |
Commondale, Putney |
30 May — 02 June |
Delays unlikely Some carriageway incursion |
Works description: OUTSIDE STOP VALVE INSTALLATION IN FOOTWAY |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU275OSV-191141-01 |
A205 Upper Richmond Road, Putney |
30 May — 01 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: BT/Armada need to install a fish plate for the new phone box. Pedestrian management will be installed. |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005PL1W0000LOWW0046/01 |
Chelverton Road, Putney, London |
30 May — 01 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000030996164-001 |
|
|
Winthorpe Road, Putney |
30 May — 01 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: OUTSIDE STOP VALVE INSTALLATION IN FOOTWAY |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU275OSV-191117-01 |
|
|
|
|
Disraeli Road, Putney |
31 May — 08 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Lay new service to 143 excavating in the nearside footway with a minimum of 1m to be maintained for pedestrians and excavating in the nearside carriageway within parking suspension, |
|
|
Responsibility for works: SGN |
|
|
Current status: Planned work about to start |
|
|
Works reference: XW047W115290981-01228 |
|
|
A3 Kingston Road, Roehampton |
01 June — 03 June |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: 10/022 TEL0180026 - Access TfL traffic signal pole 19 to install MVD, 22:00-05:00, pole is on central reservation so W/B lane 4 closed for safety zone |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG516S000000003831 |
|
|
|
|
A219 Putney High Street, Putney |
31 May — 02 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Replace 1 jointbox frame and cover(s) (725mm x 225mm) in Footway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500261659306 |
|
|
|
|
A3209 Putney Bridge Road |
01 June — 06 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Build 2 precast chamber in 915mm x 445mm x 965mm deep in Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 4m of 1 way poly duct in Footway |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC006TI001LC500262505302 |
|
|
|
|
A3 West Hill, Wandsworth |
31 May — 02 June |
|
|
Delays unlikely No carriageway incursion |
|
Works location: Unknown |
|
|
Works description: LAY NEW GAS MAIN AND SERVICES TO NO 70 - EXCAVATE IN THE NEARSIDE FOOTWAY MAINTAINING 1.2M FOR PEDESTRIANS |
|
|
Responsibility for works: SGN |
|
|
Current status: Planned work about to start |
|
|
Works reference: XW047W114628710-06045 |
|
|
|
|
|
|
|
Roedean Crescent, Roehampton |
01 June — 08 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Connections Projects:Installation of a new electricity supply for a customer:EXCAVATE AND EXPOSE MAINS CABLE FOR INSTALLATION OF A NEW ELECTRICAL SUPPLY. |
|
|
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
|
|
Current status: Planned work about to start |
|
|
Works reference: EC40010747497 |
|
|
|
|
Roedean Crescent, Roehampton |
01 June — 08 June |
|
|
Delays unlikely Some carriageway incursion |
|
Works location: Unknown |
|
|
Works description: Connections Projects:Installation of a new electricity supply for a customer:EXCAVATE AND EXPOSE MAINS CABLE FOR INSTALLATION OF A NEW EECTRICAL SUPPLY. TEMP WALKWAY TO BE SET OUT FOR DURATION OF OUR WORKS. |
|
|
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
|
|
Current status: Planned work about to start |
|
|
Works reference: EC40010746897 |
|
|
|
|
|
Rocks Lane (the bridge by Barnes Station) - will be subject to temporary 2-way traffic signals from 26 February to 10 July. Essential as Bridge will become too weak to take high level of traffic over it if nothing is done. London Buses will continue on their normal routes. The work on Rocks Lane railway bridge will see the use of temporary two way traffic signals which will be controlled manually between the hours of 7am and 7pm to prevent the traffic building up.
The table below is a schedule of road restrictions and rail possessions during this period.
Date/Time |
Activity |
26th Feb to 10th July |
2-way traffic signals on Rocks Lane |
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
June 1, 2018
|