Road Closures Ahead in Putney and Roehampton


Diversions and delays in the local area due to road works

putney road closures

A205 Upper Richmond Road, Putney

02 August — 04 August

Delays likely Traffic control (two-way signals)

Works location: A205

Works description: Tfl Maintenance Works- Install 4 Loop Count Site And Free Issue Cabinet

Responsibility for works: Transport For London

Current status: Planned work about to start

B349 Lower Richmond Road, Putney

03 August — 03 August

Delays likely Traffic control (two-way signals)

Works location: B349

Works description: Council Defect

Responsibility for works: Thames Water

Current status: Planned work about to start

A306 Roehampton Lane, Roehampton

31 July — 05 August

Delays likely Contra-flow

Works location: A306

Works description: Dslam Street Cabinet& Power Installation Plus Pcp Reshell. Excavate To Lay Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site.

Responsibility for works: BT

Current status: Planned work about to start

Roadworks

A219 Wimbledon Park Side, Southfields

04 August — 06 August

Delays likely Traffic control (two-way signals)

Works location: A219

Works description: W.R.P. - Installation Of 3 Bay Non Ad Bus Shelter, Back Of Path, For And On Behalf Of Transport For London 0132/5619 2664916

Responsibility for works: London Transport

Current status: Planned work about to start

Mill Hill, Barnes

31 July — 11 August

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

Putney Bridge Road

24 July — 11 August

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Advanced planning

Beaumont Road, Southfields

03 August — 31 August

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Wandsworth London Borough Council

Current status: Planned work about to start

Charlwood Road, Putney

12 June — 29 September

Delays likely Road closure

Responsibility for works: SGN

Current status: Advanced planning

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

August 3, 2017