Road Closures Ahead in Putney and Roehampton


Diversions and delays in the local area due to road works

putney road closures

Roehampton Lane, Roehampton

25 November — 25 November

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: O2 (UK) Limited

Vine Road, Barnes

22 November — 25 November

Delays likely Road closure

Works location: Vine Road Level Crossings...

Works description: On/Off Tracking Rrv And Fbwm, Removing Scrap And Materials Following A Conductor Rail Install Tempo...

Responsibility for works: Network Rail Infrastructure Ltd

Wimbledon Park Road, Southfields

14 November — 12 January 2017

Delays likely Traffic control (multi-way signals)

Works location: -

Works description: -

Responsibility for works: SGN


Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

November 24, 2016