Road Closures Ahead in Putney and Roehampton


Diversions and delays in the local area due to road works

putney road closures

Upper Richmond Road, Barnes

18 October — 31 October

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: UK Power Networks

Current status: Planned work about to start

Upper Richmond Road, Putney

18 October — 31 October

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: UK Power Networks

Current status: Planned work about to start

A219 Putney Hill, Putney

28 October — 29 October

Delays likely Lane closure

Works location: A219

Works description: Interim To Permanent Reinstatement To Be Carried Out. Dig Out Temp Core Hole& Redo

Responsibility for works: SGN

Vine Road, Barnes,

24 October — 28 October

Delays likely Road closure

Works location: Level Crossing

Works description: Change Of Defect Rails On The Up And Down Roads Of Level Crossing. 23:00 Mon 24th Oct To 06:00 Fr...

Responsibility for works: Network Rail Infrastructure Ltd



Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

October 27, 2016