Road Closures Ahead in Putney and Roehampton
Diversions and delays in the local area due to road works
Upper Richmond Road, Barnes |
18 October — 31 October |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
Upper Richmond Road, Putney |
18 October — 31 October |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
Kingston Road, Roehampton
20 October — 21 October
Delays likely Lane closure
Works location: -
Works description: -
Responsibility for works: Transport For London
Putney High Street, Putney
20 October — 21 October
Delays likely Lane closure
Works location: -
Works description: -
Responsibility for works: Thames Water
Upper Richmond Road, Putney,
20 October — 21 October
Delays likely Traffic control (multi-way signals)
Works location: -
Works description: -
Responsibility for works: Thames Water
Putney High Street, Putney
22 October — 23 October
Delays likely Traffic control (two-way signals)
Works location: -
Works description: -
Responsibility for works: Thames Water
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
October 21, 2016
|