Road Closures Ahead in Putney and Roehampton
Diversions in the local area due to road works
A205 Upper Richmond Road, Putney |
03 November — 05 November Lane closure |
Delays likely due to Streetworks
Bridge Structure Repairs Working From 00.05-06.00 First Shift And Then 22.00-06.00 at Bridge (Rail Over Road) No: 8a/3 Adjacent To Wandsworth County Court |
Responsibility: Network Rail Infrastructure Ltd |
EToN status: Advanced planning |
|
A306 Roehampton Lane, Roehampton |
02 November — 13 November Lane closure |
Delays likely due to Streetworks
Laying New Section Of Water Main In Carriagway And Footway at A306 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
A306 Roehampton Lane, Roehampton |
02 November — 13 November Lane closure |
Delays likely due to Streetworks
Laying New Sectionof Water Main In Carriageway And Footway, These Works Are In Conjuction With Mu30900080154273/Ph1 at A306 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
A218 Merton Road, Wandsworth |
05 November — 09 November Traffic control (two-way signals) |
Delays likely due to Streetworks
W.R.P. - Upgrade Of 2 Bay Non Ad Bus Shelter, Back To Kerb, For And On Behalf Of Transport For London 0132/8292 2408482 at A218 |
Responsibility: London Transport |
EToN status: Planned work about to start |
|
A306 Roehampton Lane, Roehampton |
06 November — 08 November Contra-flow |
Delays likely due to Streetworks
Working On Behalf Of Thames Water Carrying Out Mains Connections In Order To Provide A Better Water Main Network. Works Will Be In The C/W Using Contra-Flow at A306 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
Armoury Way, Wandsworth |
06 November — 07 November Lane closure |
Delays likely due to Streetworks
- at - |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
A306 Roehampton Lane, Roehampton |
04 November — 30 November Traffic control (multi-way signals) |
Delays likely due to Streetworks
Signals - Traffic Signal Mods Works Fw: 5x Demolish & Re-Build Chambers & Ducting + Install 6xnal Sockets + 1xnal Base Controller Cw: Whole Jnc To Be Controlled By Temp Lights With Ped Facilities. Works On Narrow Fw, Will Required Fw Closures, Where Peds Will Be Diverted To An Alternate Crossing Point + Peds On Cw For 3 Days Between 1800-2300. Lane Closures Required For Safe Working Zones. Welfare Unit, Works Vehicle & Materials To Be On Roehampton Lane In Suspended Bays at A306 |
Responsibility: Transport For London |
EToN status: Advanced planning |
Water Leaks and Gas Escapes
Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks
WATER: 0800 714614
GAS: 0800 111999
All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.
For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.
November 5, 2015
|