Road Closures Ahead in Putney and Roehampton


Diversions in the local area due to road works

A306 Roehampton Lane, Roehampton

04 August — 05 August Lane closure

Delays likely due to Streetworks
10/164 Tel16400 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd2& Sd3 Plus Feed To Existing Chamber - Northbound C/W Swapping Lane 1 & 2 And F/W To Chamber (Ped Access Maintained) - Ped Access Maintained. Van And Additional Equipment Parked In Bay - 22.00-05.00 at A306

Responsibility: Transport For London

EToN status: Planned work about to start

A306 Roehampton Lane, Roehampton

05 August — 18 August Lane closure

Delays likely due to Streetworks
Digital Speed Camera Renewal Scheme - Carriageway& Footway Works - Replacement Of Existing Speed Camera Camera Pole In F/W Plus Slot Cut And Install New Sensors In Carriageway at A306

Responsibility: Transport For London

EToN status: Planned work about to start

A205 Upper Richmond Road, Putney

30 July — 07 August Contra-flow

Delays likely due to Streetworks
Connections Projects:New Supply Scheme: (Approx Depth 450mm-600mm):High Voltage Joint Hole To Provide New Supplies To The Lodge Hotel. at A205

Responsibility: UK Power Networks

EToN status: Planned work about to start

A205 Upper Richmond Road, Putney

01 August — 09 August Traffic control (two-way signals)

Delays likely due to Streetworks
New Water Connections 8x32mm And 1x 100mm Metered Supplies Off 7' Ci Main at A205

Responsibility: Thames Water

EToN status: Planned work about to start

Lower Richmond Road SW15 is closed between the junctions of Queens Ride and Rocks Lane for carriageway resurfacing works on 07/08/2015 (Night Works Only). Local diversions apply. Engineer P Swallow 020 8871 6686.

Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For further information please contact the Engineer in the first instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

August 4, 2015

Related links

A219 Putney High Street, Putney

03 August — 05 September Traffic control (multi-way signals)

Delays likely due to Streetworks
Signals - Tfl Traffic Signal Modernisation Works F/Way Works: Demolish & Re-Build 10x Chamber And Install 9x Nal Sockets + 1x Controller Nal Base + New Carriageway & Footway Ducting Installation . Civils On Putney High Street Ped Island To Be Done During Week Nights Due To Lane Closures Required For Safety Zones. C/Way Works: Centre Island Civils Works + Ducting. Signal Installation Works To Be Done Over Nights Due To Required Lane Closures For Safety Zones at A219

Responsibility: Transport For London

EToN status: Planned work about to start

A3209 Putney Bridge Road

03 August — 05 September Traffic control (multi-way signals)

Delays likely due to Streetworks
Signals - Tfl Traffic Signal Modernisation Works Fw:Demolish & Re-Build 10x Chamber, Install 9x Nal Sockets, 1x Controller Nal Base + New Cw/Fw Duct. Civils On Putney Bridge Rd Ped Island Will Require The Island To Be Closed, Working Hours To Be Mon-Fri 1900-2300, Sat 0800-1300 Cw:Installation Of New Duct Across Eb/Wb Lanes. Pibs To Be Done Over 3 Wk Nights With Jnc Under Temp Lights With Ped Facilities & Lane Closures. Signal Installation To Be Done Nights Due To Lane Closures For Safety Zone at A3209

Responsibility: Transport For London

EToN status: Planned work about to start