Road Works Ahead in Putney


Traffic disruption and diversions may occur

24 March to 6 May - Keswick Road SW15 Gas mains replacement works are on-going.

A205 Upper Richmond Road, Putney

31 March — 01 April

Delays likely Lane closure

Works location: Upper Richmond Road Wb Jw Putney Park Ave, Eb O/S 254, Eb Opp 43

Works description: Wb3-Safety Patch Defect-Failed Patch/Smmoth Unknown Mhc/Sunken Cw Ponding Lane 1

Responsibility for works: Transport For London

Current status: Planned work about to start


A217 Ram Street, Wandsworth

31 March — 31 March

Delays likely Lane closure

Works location: Sb Ram Street Side Of Brewery Main Entrance Before 4

Works description: Cat 2h 7 Day Order-Broken Fillet Around Mh Lane 4

Responsibility for works: Transport For London

Current status: Work in progress


A217 Swandon Way, Wandsworth

31 March — 01 April

Delays likely Lane closure

Works location: Swandon Way Nr Jw Old York Rd Wb

Works description: Safety Patch Defect-Noisy Cover In Road Lane 1

Responsibility for works: Transport For London

Current status: Planned work about to start

 

A3 West Hill, Wandsworth

31 March — 05 April

Delays likely Traffic control (two-way signals)

Works location: A3

Works description: New Water Connections To New Build 2x32mm Bp Supplies Off 9" Ci Main.7m Footway And 8m In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start


A217 Wandsworth Bridge Road, London, Hammersmith And Fulham

29 March — 31 March

Delays likely Traffic control (Stop/Go boards)

Works location: 340 (Opp)

Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

 



March 31, 2014

Related links