Road Works Ahead in Putney
Traffic disruption and diversions may occur
24 March to 6 May - Keswick Road SW15 Gas mains replacement works are on-going.
A205 Upper Richmond Road, Putney |
31 March — 01 April |
Delays likely Lane closure |
Works location: Upper Richmond Road Wb Jw Putney Park Ave, Eb O/S 254, Eb Opp 43 |
Works description: Wb3-Safety Patch Defect-Failed Patch/Smmoth Unknown Mhc/Sunken Cw Ponding Lane 1 |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
A217 Ram Street, Wandsworth |
31 March — 31 March |
Delays likely Lane closure |
Works location: Sb Ram Street Side Of Brewery Main Entrance Before 4 |
Works description: Cat 2h 7 Day Order-Broken Fillet Around Mh Lane 4 |
Responsibility for works: Transport For London |
Current status: Work in progress |
|
A217 Swandon Way, Wandsworth |
31 March — 01 April |
Delays likely Lane closure |
Works location: Swandon Way Nr Jw Old York Rd Wb |
Works description: Safety Patch Defect-Noisy Cover In Road Lane 1 |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
A3 West Hill, Wandsworth |
31 March — 05 April |
Delays likely Traffic control (two-way signals) |
Works location: A3 |
Works description: New Water Connections To New Build 2x32mm Bp Supplies Off 9" Ci Main.7m Footway And 8m In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
A217 Wandsworth Bridge Road, London, Hammersmith And Fulham |
29 March — 31 March |
Delays likely Traffic control (Stop/Go boards) |
Works location: 340 (Opp) |
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start
|
|
|
March 31, 2014
|