Forum Topic

Well well well, at least three happy bunnys, supposedly.So I take it you are also happy that this project is at least three times over budget. Wow! Hounslow must be laughing their heads off that no one has even blinked an eyelid. That you are also happy a long establish spinney has been utterly destroyed to be replanted by by a mono culture of willow.Also happy that we were originally told that the reason for the walkway was people were scared to use the tunnel (baloney) but even after this was shut it still went ahead.When this excuse fell apart we were told it would encourage many more people to participate in "active travel" which is a buzz word for walking. Another load of baloney.Finally Hounslow hit upon the "fact" a great view of the river would be gained. More baloney. Don't get me wrong the idea of a walkway would be fine when the time was right and cash was aplenty. Richmond have constructed one on the far bank. A perfectly serviceable, workman like job that shapely  contrasts with the multi million stainless steel and concrete job Hounslow have blown the budget wide open on.Oh, I nearly forgot, the German Snails and one of the last  stretches of natural shoreline on upper Thames that needs protecting. So what do  Hounslow do? Rather than leave alone lets protect it by building large concrete piers, steam hammering yards of campshedding into the river bed and then filling it with hundreds maybe thousands of tons of backfill. I know I am a person not easily pleased but it's good to know others are.

Adrian Irving ● 1500d

The Thames Path National Trail report atDukes Meadows was commissioned to lookat safety and access issues related to theThames Path. It put forward cost proposals forimprovements specifically focussed on trafficmanagement and streetscape.The options developed in the report addressedthree quite different solutions; a tunnel, trafficmanagement and riverside solutions.Each option was costed and illustratedand was accompanied by a shopping list ofimprovements described as components. The Tunnel option included:A proposed tunnel under Barnes Bridgeto the north of Dukes Hollow. This optionalso included: a new footpath surface andincreased width, boardwalks along sectionsof the river, formalisation of car park areaswith new surfaces and improved seating.The traffic management option included:Alterations to pedestrian and vehicle use ofDan Mason’s Drive. In addition to the optionabove and excluding the tunnel the proposalsincluded a vehicle barrier and turning pointand adjustments to kerb lines with footwaywidth enhancements.The Riverside option included:A proposal that focussed on keeping theThames Path as close to the banks of theThames as possible. This proposal included acantilevered bridge under the Barnes Bridge.It also included the principle components ofthe Tunnel option excluding the tunnel itsel Each proposal could be supplementedby a series of optional extra improvements.These focussed on access improvementsand legibility but were not deemed to beintegral to the proposals.The report concluded that the Riverside optionwas the effective and cost efficient solution.The same issues identified during thestudy also apply today if this option wereto be taken forward, which are specificallyrelated to the preservation of natural assetsat Dukes Meadows during the design andimplementation of a cantilevered bridge linkunder Barnes Bridge. DUKES MEADOWSBASE LINE REVIEW &STAKE HOLDER STRATEGYLONDON BOROUGH HOUNSLOW http://www.dukesmeadowspark.com/files/pdf/atb_dukes_meadow_report_small_04092016980.pdf

Bernard Allen ● 1500d