I think the idea came from the Thames Strategy document.They looked at the Thames path in detail and came up with an overhaul plan for a continuous Thames path from Tedington to London.Light years ago local people were consulted about the Barnes Bridge area, and one thing that came at the time, was you had to leave the Thames path  and divert down Dan Mason Drive , under the bridge and back up the Promenade by the boat houses. Some people found that in a winters evening they were unsafe using this route, along with many other reasons.As there is a walkway under Barnes Bridge on the Surrey side, the parks management company at the time started to look into ways to link the Thames path on the Middlesex side. Plans were drawn up for a tunnel under the embankment and a walkway under the bridge.So if you can find. A Copy of the Thames Strategy Document it will probably give you an insight to why certain projects have either been install or are still being talked about.Since that strategy was drawn up, I have seen many Chiswick residents move out and the newer residents have know Idea of what is or was going to happen in their area. I even got asked last year where Dukes Meadows is, So you have to start re-educating the residents again, as sometimes, something that was agreed to be built years ago suddenly starts being built and nobody knows what’s going on.It’s come a long way since those days thanks to local residents who got together approximately 1998 to save the football fields from disappearing and then carried on working in the park.

Bernard Allen ● 2052d

John, please can you advise why access and the site base to build the footbridge was not planned to go on the Chiswick Boat Club side? Putting it on the other side will mean that construction traffic will cross Staveley and Alexandra Gardens, two residential neighbourhoods and a school route. It seems very disrespectful of people in these neighbourhoods to expose them to lorry traffic at the same time that great lengths are being gone to to make other residential neighbourhoods car free and to create safe school routes.Traffic will also go along Riverside Drive and the Promenade, which are currently heavily used by people enjoying the park. Accessing via Chiswick boat house would have meant that site traffic accessed via Dan Mason Drive, which has no residential intersections. It is also fairly quiet at the moment being mainly used by traffic to the sports clubs, which are closed. Accessing via Chiswick Boat House would also have involved less environmental damage as there is already a clear route down onto the foreshore and a large open area.Finally, why still no engagement with Dukes Meadows Trust, whose volunteers have done and still do so much in the park. Is that not recommended good practise? The Trust commissioned the first feasibility study that identified the footbridge as the best option to join the Thames Path and improve public transport access for the clubs upstream and have lobbied for it since. It is sad that the council won't work with parks groups, who know their parks very well and whose only interest is protecting and improving them for people to enjoy.

Kathleen Healy ● 2052d

The cantilever footbridge wasn't in the Thames Strategy report. On page 20 it shows a yellow bubble on the railway bridge and says "potential enhancement of railway bridge for pedestrians and cyclists". That referred to the proposal to open the disused footbridge on the upstream side of the railway bridge. Following on from that Dukes Meadows Trust commissioned a feasibility study which concluded that it wasn't feasible to open the disused footbridge as it would need to be DDA compliant. On the Chiswick Side a long path with a shallow rise could be built along the embankment, but the Barnes side would have needed a new, long ramp along Barnes Passage or a lift. The conclusion was that that made reopening the footbridge unfeasible. The study also looked at putting a new tunnel through near the river, but as Network Rail would be unlikely to consent and it would be very expensive that too was deemed unfeasible. A footbridge under the railway bridge, as on the Barnes side was identified, as the most feasible option.It was included as a proposal in a later transport and access strategy commissioned by the council. Architects were commissioned and designed a bridge. I remember it being show at a meeting at the Golf Club, but then the project stalled. I believe due to objections from the PLA. It was revived late on in the recent masterplan process, as a good way of improving access to the new sports facilities, that were to receive millions in investment from various sports bodies. It will make public transport access to those facilities possible. A big potential user group is schools and the Housnlow line stops near just about all the schools in Hounslow and on to Staines in one direction and Putney and Wandsworth etc. in the other direction.

Kathleen Healy ● 2052d