Traffic Delays Likely in Chiswick
Forthcoming significant roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area.
A205 Chiswick High Road (North Circular Road), Chiswick |
14 July — 28 July |
Delays likely Traffic control (two-way signals) |
Works location: A205 |
Works description: Approx 102m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Ttro Application Also Required For Road Closure On Lionel Road South, Lane Closure At Jnc With South Circular Road And Capital Interchange Way. |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Advanced planning |
A205 Chiswick High Road (North Circular Road), Chiswick |
28 July — 01 August |
Delays likely Lane closure |
Works location: A205 |
Works description: Approx. 106m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Collaborative Work With Gas Company. Bus Lane Suspension. |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Advanced planning |
|
A4 Great West Road, Brentford |
28 July — 29 July |
Delays likely Lane closure |
Works location: A4 |
Works description: Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
Prince Of Wales Terrace, Chiswick |
27 July — 29 July |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
A4 Cedars Road, Chiswick |
25 July — 13 August |
Delays likely Lane closure |
Works location: A4 |
Works description: Removing Existing Safety Barrier And Replacing With Flexibeam System |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
A4 Great West Road, Brentford |
25 July — 05 August |
Delays likely Lane closure |
Works location: A4 |
Works description: 22:00 To 05:30hrs. Lane 1 And 2 Closure Or A Lane 3 And 2 Closure Eastbound For Delaminated Concrete Surveys Of The A4 Piers (Pier 31 To Pier 1) |
Responsibility for works: Highways England |
Current status: Advanced planning |
|
A315/A205 Kew Bridge Road, Brentford |
23 July — 07 August |
Delays likely Lane closure |
Works location: A315/A205 |
Works description: Excavate Of 30" Water Main To Remove A Defect Section Of Approx 40m In Southbound Carriageway, Working For Optimise On Behalf Of Thames Water |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
A4 Great West Road, Brentford |
18 July — 28 July |
Delays likely Lane closure |
Works location: A4 |
Works description: 22:00 To 05:30hrs. Lane 1 And 2 Closure Or A Lane 3 And 2 Closure Westbound For Delaminated Concrete Surveys Of The A4 Piers (Pier 1 To Pier 31) |
Responsibility for works: Highways England |
Current status: Advanced planning |
|
Shirley Road, Chiswick |
18 July — 15 August |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Ealing London Borough Council |
Current status: Advanced planning |
|
A406 Gunnersbury Avenue (North Circular Road) |
11 July — 21 August |
Delays likely Lane closure |
Works location: A406 |
Works description: Closure Of One Northbound Lane To Facilitate The Diversion Of Thames Water Main Onto Service Bridge. Northbound Traffic Flow Maintained In Lane Two |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
A205 Chiswick High Road (North Circular Road), Chiswick |
14 July — 28 July |
Delays likely Traffic control (two-way signals) |
Works location: A205 |
Works description: Approx 102m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Ttro Application Also Required For Road Closure On Lionel Road South, Lane Closure At Jnc With South Circular Road And Capital Interchange Way. |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Advanced planning |
Devonshire Road, Chiswick |
04 July — 09 August |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
Source: www.roadworks.org
|