Traffic Delays Likely in Chiswick


Planned roadworks in the W4 area

The following roadworks are likely to cause some delays in the Chiswick area: Some may not cause delays but residents may be interested to know of work going on in advance.

New Overnight Closures on Hammersmith Flyover Until 3 November

Acton High Street to Be Closed Until 29 October

A315 Chiswick High Road, Chiswick

29 October — 30 October Lane closure

Delays likely due to Streetworks
25/035 Tel46843 - Recut Tfl Sd5 Magnetometer. 22:00-05:00, Magnetometer Will Take Approx 30 Mins To Replace. E/B Lane 2 And Some Lane Incursion W/B For Safe Working Area. at A315

Responsibility: Transport For London

EToN status: Planned work about to start

Devonshire Road, Chiswick

28 October — 30 October Road closure

Delays likely due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

A402 Goldhawk Road

26 October — 06 November Traffic control (multi-way signals)

Delays likely due to Streetworks
To Construct A Chamber Over 30" Main In C/W And Install A Gate Valve On Behalf Of Thames Water, Using Multi Way Signals And Parking Bay Suspensions at A402

Responsibility: Thames Water

EToN status: Planned work about to start

A402 Goldhawk Road

26 October — 20 November Traffic control (multi-way signals)

Delays likely due to Streetworks
To Construct A Chamber Over 30" Main In C/W And Install A Gate Valve In C/W And F/W On Behalf Of Thames Water, Using Multi Way Signals at A402

Responsibility: Thames Water

EToN status: Planned work about to start

Sutton Court Road, Chiswick

26 October — 28 October Traffic control (Stop/Go boards)

Delays likely due to Streetworks
- at -

Responsibility: Transport For London

EToN status: Planned work about to start

B490 Winchester Street, Acton

21 October — 03 December Lane closure

Delays likely due to Streetworks
Traffic Signals Modernisation Site 27-040 Lane 1 Closure 09:30 15:30 Localised Pedestrian Management. 1.2m Pedestrian Clearance. Temporary Multiple Way Traffic Lights. Pedestrian Diversion In Place. 08:00 18:00 at B490

Responsibility: Transport For London

EToN status: Advanced planning

A402 Goldhawk Road, Hammersmith And Fulham

19 October — 30 October Contra-flow

Delays likely due to Streetworks
To Construct A Chamber In F/W Only On 30" Main And Install A Gate Valve On Behalf Of Thames Water, Using Contra Flow. at A402

Responsibility: Thames Water

EToN status: Planned work about to start

A4/A3005 Great West Road, Brentford

07 March — 30 November

Delays likely Lane closure

Works location: A4/A3005

Works description: Strengthening Works At Piers 19,20& 30 And 38-103 On The A4 Great West Rd With Night Time Lane Closures Between Chiswick ( Larch Drive & Boston Manor Rd During The Hours Of 10.30pm To 05.00am Mondays-Sundays Inclusive. Lane Closures Will Be A Lane 1 & 2 Closure With Lane 3 Running Or A Lane 2 & 3 Closure With Lane 1 Running Both East And West Bound On The A4 . See Package 3 Works Location Drawing Attached : Drawing 5103542/Dr/St/Wp3/001 Coordinated With Hammersmith Flyover

Responsibility for works: Highways Agency

Current status: Planned work about to start

Source: www.roadworks.org

October 28, 2015