Planned roadworks in the W4 area
The following roadworks are likely to cause some delays in the Chiswick area:
Major Work On Chiswick Bridge to Spring 2015
More Overnight Closures For Hammersmith Flyover to Spring 2015
14 February — 15 February |
||
Delays likely Traffic control (priority working) |
||
Works location: A315 |
||
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S),Install 2m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway |
||
Responsibility for works: BT |
||
Current status: Planned work about to start |
Source: www.roadworks.org
February 14, 2015