| A205 Chiswick High Road (north Circular Road), Chiswick, London, Hounslow |
| 28 September — 30 September |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: 1 x joint hole & 2m trench for 1 x new LV connection |
| Responsibility for works: Scottish and Southern Power Distribution |
| Current status: Planned work about to start |
| Works reference: LP551S30002092 |
|
|
| A315 Chiswick High Road, Chiswick, London, Hounslow |
| 29 September — 11 October |
| Delays likely Road closure |
| Works location: Unknown |
| Works description: Excavate, rebuild frame and cover and reinstate on behalf of Vodafone while working under a road nclosure |
| Responsibility for works: Vodafone |
| Current status: Planned work about to start |
| Works reference: NX50218JHG111 |
|
|
| B4491 Little Ealing Lane, Ealing, Ealing |
| 29 September — 02 October |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: Lead Serv Pipe Relay Sz P Cway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000030776617-006 |
|
|
| B452 Northfield Avenue, West Ealing, Ealing |
| 29 September — 30 September |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Remedial works in carriageway surrounding sewer cover |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU026002141BJZZ--000002 |
|
|
| B452 Northfield Avenue, West Ealing, Ealing |
| 29 September — 02 October |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU026002141CKPL--000004 |
|
|
| A3000 Wellesley Road, Chiswick, London, Hounslow |
| 29 September — 02 October |
| Delays possible Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: Interim to permanent reinstatement |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSEMFI/100227287 |
|
|
| A4,A3002 Boston Manor Road, Brentford, Hounslow |
| 28 September — 03 October |
| Delays possible Some carriageway incursion |
| Works location: Unknown |
| Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU356002141DRHZ--000002 |
|
|
| A315 Chiswick High Road, Chiswick, London, Hounslow |
| 28 September — 02 October |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: NEW CUSTOMER CONNECTION-CLEAR BLOCKAGE IN FOOTWAY |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSSMRE/100246240 |
|
|
| Alexandra Road, Kew, Richmond upon Thames |
| 28 September — 30 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: Interim to permanent reinstatement |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSEMFI/100227664 |
|
|
| Grange Road, Ealing, Ealing |
| 28 September — 03 October |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: FIT NETWORK TRACK EXTENSION AND FIT NEW SWEPT TEE TO ALLOW CUSTOMER CONNECTION |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SCLJFI/106643/LSM |
|
|
| Kew Green, Kew, Richmond upon Thames |
| 28 September — 30 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: Interim to permanent reinstatement |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSEMFI/100214430 |
|
|
| Marlborough Road, Chiswick, London, Hounslow |
| 29 September — 02 October |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Interim to permanent reinstatement |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSEMBU/100234580 |
|
|
| Midhurst Road, West Ealing, Ealing |
| 29 September — 30 September |
| Delays unlikely No carriageway incursion |
| Works location: Unknown |
| Works description: CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY |
| Responsibility for works: VIRGIN MEDIA |
| Current status: Planned work about to start |
| Works reference: NK100/SSERRE/13913083J9 |
|
|
| Orchard Road, Brentford, Hounslow |
| 28 September — 03 October |
| Delays unlikely Some carriageway incursion |
| Works location: Unknown |
| Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031161825-001 |
|